Skip to content
Greyline

Greyline

Construction Ltd

  • Home
  • About us

        • Management Team
        • greyline management team

        • Accreditations
        • greyline accreditation

        • Careers

        • Social Value
        • greyline social responsibility
  • Latest News
  • Services

        • Social Housing

        • Public Buildings

        • Frameworks
  • Testimonials
  • Contact

Social Housing Case Studies Archive

249_C3H_1761 small
Read more

LB Hammersmith and Fulham two major voids

Greyline have completed two major voids for the LB Hammersmith and Fulham (a 2 bed house and a 3 bed flat), both requiring extensive renovation following house fires. The scale of the damage to both properties required our team to undertake an extensive refurbishment including window replacements…

CEH_3814 web
Read more

Headcorn and Tenterden FRA Works

Greyline have completed fire safety works to three low-rise blocks for Homes for Haringey in Headcorn and Tenterden Roads. The project involved the installation of automatic fire detection systems, fire door installations and fire compartmentation work across all three…

312_C3H_1957 small
Read more

Metropolitan Thames Valley Housing: Colcutt Lodge, Ferndale, Sandmere Road and Woodgate Drive

Greyline have been working with Metropolitan Thames Valley Housing since 2019 providing a planned works service which runs in tandem with the client’s DLO who provide day to day repairs…

008_Greyline_200922 small WEB
Read more

RB Greenwich Ernest Dence Estate

Greyline are nearing completion on a programme of cyclical works and improvements to blocks on the RB Greenwich’s Ernest Dence Estate. Constructed in the 1930s the Estate is formed from three main residential blocks (Gifford, Aylmer, and Jennings)…

P1030017 side WEB
Read more

RB Greenwich Kitchens and Bathrooms Replacements 2020/21

Greyline undertook a 12-month programme to deliver kitchen/bathroom replacements to 180 individual properties across the Royal Borough of Greenwich’s property stock, a London Borough which spans 18 square miles…

Metworks case study
Read more

Metworks

We are currently working direct to Metworks the inhouse Repairs & Maintenance subsidiary of Metropolitan Thames Valley, Greyline are supporting the delivery of Void Refurbishment works and Ad-Hoc planned maintenance works to their properties in North West London.

Hazel, Camden
Read more

FRA works in Barnet

The Greyline team managed the delivery of an extensive programme of fire protection works to residential properties in three key locations, Camden, Hazel Grove in Lewisham and the Graeme Park Estate in Barnet.

Haringey Northumberland Park Estate
Read more

Homes for Haringey Northumberland Park Estate

Following fire risk assessments by the client, essential maintenance and fire protection works were identified to medium rise and tall blocks on the estate…

LB Haringey Supply Chain Management Group
Read more

LB Haringey Supply Chain Management Group (SCMG)

Our works for the London Borough of Haringey are an exemplary demonstration of our ability to deliver on-time, to target programmes and within budget. Since 2008 Greyline have completed an extensive programme of internal, external and FRA works in the Borough.

LEMB Harnigey feature image
Read more

Loughborough Estate

Working on 1200 homes on the Loughborough Estate from tall blocks to houses. Including extensive external works to the blocks/houses and the replacement of 700+ kitchens and bathrooms.

fra-barnet-gallery3-greyline
Read more

London Borough of Brent

Greyline undertook a 6-month programme of fire protection works to Brent Housing Partnership property stocks to ensure homes were fully compliant with current fire regulations and provide residents with assurance that their homes were as safe as possible.

Greyline logo black

Unit 2 - 3,
29 Fourth Way,
Wembley
HA9 0LH

Tel: 0208830 0060

Follow us

Greyline Ltd 2019©
ISO9001 logo ISO14001 logo Nic Eic logo
BMTrada logo Constructionline logo Chas logo Living wage logo
SEC Framework footer logo ProcurePublic Framework Partner


Privacy Policy

Cookie Policy

Equality Policy

Modern Slavery Policy

Health & Safety Statement

Quality & Environment Policy

Copyright © 2026 Greyline All rights reserved. Theme: Flash by ThemeGrill. Powered by WordPress